Loft Floor
- Wundaboards 20mm / 16mm MLCP 100m Max Length
- 150mm centers
- UFH pipework to come from 1st floor manifold
- Heatmiser Controls NeoStat X1
- Pump and Blend set for different finishes.
- Cat6 to each room going from manifold, for possible future room sensing and automation
First Floor
- Emmetti Manifold,
- Wundaboards 20mm / 16mm MLCP 100m Max Length
- 150mm centers
- Heatmiser Controls NeoStat
- Heatmiser Junction Box
- Pump/Mixer set for different finishes. ADD SPACE for LATER
- Manifold to boiler 5 core flex
- Cat6 to each room going from manifold, for possible future room sensing and automation
Ground Floor
- Emmetti Manifold,
- Wundaboards 20mm / 16mm MLCP 100m Max Length 150mm centers
- Heatmiser Neo Thermostat with Zone valve.
- If multizone add Heat miser junction box, stats and actuators.
- Pump/Mixer set for different finishes. ADD SPACE for LATER
- Manifold to boiler 5 core flex
- Cat6 to each room going from manifold, for possible future room sensing and automation
Boiler
- Viessmann 100-W 19 KW 4 Pipe
- Weather Compensation setup. Outdoor sensor and wire to go to NW / N wall.
- De-aerator, Dirt Filter.
Cylinder
- Viessmann 250L High Recovery coil / Heat Pump Coil 26KW or Twin Coil
- Joule High Gain Indirect. 210/ 250L . Â Short Stand Tall to compartment size.
Important:
Make note of pipework circuit length used to each manifold port.
Misc:
- Wundaboards 16mm / 12mm MLCP. 60m Max length